Location
The site for constructing and equipping the crusher must be close to major projects, as well as close to the
demolition materials collection sites in order to reduce the cost of production.
Products & Related Items
The aim of equipping a cement waste recycling plant is to ensure that the factory is responsible for
receiving all cement waste resulting from projects and demolition works and collecting them for use in the
production process. Three main types of materials will be produced, with varying prices for each type
determined based on the mechanisms and filters of the section used and experience. In management and
operation, these main subjects are:
- Black Sand
- Rodbes (sand and gravel)
- Stones of various sizes
Production will take place after discussing the produced materials with you to determine the needs and
requirements of the Qatari market, in order to provide a product of high quality and low price that
contributes to the economy and the local market.
Production line specifications and requirements
We will secure and install an integrated production line in order to manufacture materials produced from
recycled materials. If the factory is operated for a minimum of ten hours a day, the production capacity will
be 5,000 tons per day. Thus, the expected monthly production with a number of 26 working days per
month will be 130,000 tons per month. In case of operating one production line.